Before you start
MH Tags are set up and placed. See Setting Up MH Tags and Placing MH Tags on Drawings.What updates on every sync
Click Sync in the Acelab panel or on the Acelab Ribbon. For every product with a tag type, the sync:- writes the latest Acelab values into the tag type, so every placed tag shows them
- writes the result for each Revit Data field onto the tag type, so the tag matches the model (see below)
- renames the tag type to match your Type naming pattern
- redraws placed tags as soon as it finishes
- leaves your own instance parameters alone
Which way each field flows
You set the direction of each Revit Data field (Revit Description, Revit Cost, Revit Type Mark, Revit Type Comment, Revit Material Mark, Revit Material Comment, Revit Keynote Tag and Text) on the Revit Fields tab in Settings. Keynote Tag and Keynote Text always share one direction.
Edit a Revit Data value on a tag
- Select a placed tag and click Edit Type.
- Change the field, for example Type Mark, and click OK. Every tag of that product shows the new value.
- Click Sync.
- If only the tag changed since the last sync, the tag’s value is copied to the linked elements and sent to Acelab.
- If only the model changed, the model’s value is copied onto the tag.
- If both changed, the model’s value wins.
- If the field is empty on the tag, the tag picks up the model’s value.
When a product leaves the Acelab schedule
Removing a product from your Acelab project schedule doesn’t change anything in Revit straight away. On the next sync:- every placed MH Tag of that product is deleted, on every view and sheet
- the product’s tag type stays in the project under Families → Annotation Symbols → MH_Tags, with all its values cleared
When you change MH Tags settings
Clicking Save & Sync on the MH Tags tab updates every tag type already in the project: which fields it carries, which lines it draws and how it is named. A newly turned-on field shows Updating… until the sync finishes.Troubleshooting
| What you see | What to do |
|---|---|
| My edit on a tag was replaced after syncing | The field is an Acelab field, or a Revit Data field set to Acelab → Revit. Edit it in Acelab, or change its direction on the Revit Fields tab |
| My edit on a tag was replaced by the model’s value | Both the tag and the linked model element changed since the last sync, so the model won. Edit one of them and sync again |
| Tags disappeared after a sync | Their product was removed from the Acelab schedule. Press Ctrl+Z to undo the sync, or add the product back and place new tags |
| The Acelab field catalog could not be loaded, so tags cannot be updated. | Check your connection and sync again |

