Smart Schedule was previously called “Smart Table.” Both refer to the same feature.
When To Use Smart Schedule
- Product list tables in a submittal or spec section.
- Summary schedules on a cover page or appendix.
- Bid or take-off tables where you want the full row list, not one page per product.
Inserting a Smart Schedule
- Open a Smart Doc and select the page to place the table on.
- In the left rail, open the Smart Table drawer.
- Search or scroll to find the project schedule you want.
- Click the schedule to insert it as a table on the active page.
Configuring the Table
With the table selected, use the inspector on the right (Schedule Properties Panel) to:- Choose columns to include or hide. Only columns you enable render in the table.
- Reorder columns to control display order in the document.
- Set column widths and text alignment.
- Show or hide the header row.
- Filter or sort the rows shown, without affecting the underlying schedule.
- Style the table (borders, header background, row shading, font size).
Keeping in Sync
A Smart Schedule stays connected to its source schedule:- Adding a product to the schedule adds a row to the table.
- Removing a product removes its row.
- Editing a field value in the schedule updates the value in the table.
- Renaming a field updates the column header.
Managing Smart Schedules on a Page
- A single page can hold multiple Smart Schedules (for example, two different schedules side by side).
- If a table has more rows than fit on one page, use pagination in the Schedule Properties Panel or split the table across pages manually.
- Delete a Smart Schedule from the canvas by selecting it and pressing delete. This removes it from the document; the underlying schedule is untouched.
Smart Schedule vs. Smart Fields
See Smart Fields for placing individual values on a page.